现在招聘! 探索SMS设备的职业生涯. 观点的机会
不妥协的质量和性能

不妥协的质量和性能

With 底盘 costs consuming a significant portion of the average operating cost-per-hour of your track type equipment, properly maintaining your dozer or excavator 底盘 system is crucial. 全国最大的彩票平台 brings you a practical management approach to ensure you achieve the best performance and durability from your 底盘 components.

取决于应用程序, you can choose from a wide range of product series to cover the needs of your heavy equipment.

现在打电话 请求报价
轨道链接组件

小松 has designed six different types of link assemblies for Bulldozers to address various working environments.

More >  要求定价

跑鞋

小松 offers the correct shoe for all underfoot conditions and it is specifically engineered for both dozers and excavators.

More >  要求定价

Track & 载体辊

Friction and shock loads transmitted from the track chain create heat within the roller. 为了承受这一切, several quality steps are taken in the manufacturing of 小松 Genuine OEM rollers.
More >  要求定价

惰轮
惰轮 are a guide and a means to adjust the track tension for link assemblies. 小松托辊是精密加工后再热处理的, 润滑和密封,提供可靠的长寿命.

请求对空闲线程定价
链轮
小松 segments and sprockets are subject to multiple quality checks throughout the manufacturing process to ensure they meet 小松's stringent specifications.

请求对链轮定价
跟踪硬件
小松 track hardware is quality tested to deliver optimal performance under the most severe conditions.

请求跟踪硬件价格

底盘的选择 & 保证

All 小松 Genuine 部分 are covered by 全国最大的彩票平台's Standard 部分 Warranty — 1 year/unlimited hours

小松通用建筑底盘

Up to half the cost of operating a machine can relate to its 底盘, 取决于脚下条件和操作习惯. 小松’s renowned quality is maintained with General 建设 底盘 Link Assembly (GC Link) replacement parts.

总施工时间:48个月/ 5000小时

General 建设 has specially developed links and pins designed for low impact applications, 如: 
  • 砂/土壤
  • 民用建筑
  • 一般的挖掘
  • 泥土加载

推土机
D51, d61, d65, d155

浏览推土机

挖掘机
PC200 - PC450系列

浏览挖掘机

小松常规底盘

Conventional has a triangular design per link that has a sealed and lubricated pin and bushing assembly and is more cost effective.

常规保险:48个月/ 5000小时

小松Plus底盘

A parallel link 底盘 system which has a rotating bushing system that reduces costs and downtime by ensuring that the whole bushing component surface is worn rather than just two sides.

外加保险:60个月/ 6000小时
时长:15分钟

如何测量起落架磨损

底盘 is one of the most expensive components on your tracked machines. Documenting and knowing the life expectancy is essential to deter矿业 costs and planning for replacements on your machine. 15 minutes of your time can save you time and money in the future and reduce downtime and increase profitability on your tracked machines.
观看视频
不要错过!
目前的促销活动
In coordination with our partners, 全国最大的彩票平台 has several new promotions on now.

查看所有促销活动
订阅我们的时事通讯
保持最新的
千万不要错过最新的促销信息, 产品发布、服务提示和建筑新闻, 林业, 矿业, 以及道路和聚合主题.

现在订阅